Electrical terms


Barrier and Measuring Tool (APP) A tool belonging to PT PLN (Persero) which functions to limit the electric power used and measure the use of electrical energy

Ampere (A) Unit of Electric Current

Electricity Supporting Business Entity (BUPTL): Installers engaged in the construction and installation of electricity equipment

Load Costs (BB) The cost component in the electricity bill, which is a fixed amount, is calculated based on the connected power

Late Fee (BK) Is a fee charged to customers for not meeting the obligation to pay PLN bills on time

Connection Fee (BP) The fee that must be paid to PLN by a potential customer or customer to obtain a new connection or add power

Bulk (C) Namely the tariff class for the purpose of selling in bulk (Bulk) to Business License Holders

Current Transformer or Current Transformer (CT) Tool to reduce electric current for energy measurement purposes

Connected Power The amount of power agreed by PLN and the customer in the Power Purchase Agreement which is the basis for calculating the cost of the load

Power factor or Cos. Comparison of power consumption in Watts with power consumption in Volt-Amperes

Voltage Unbalance Factor Comparison of negative sequence voltage components to positive sequence voltage components

Hertz (HZ) A unit of electrical frequency

Running time kWh consumption in one month divided by the connected kVA

The JTL Extra High Voltage Network (JTET) operated by the TET covering all parts of the network and its equipment

The JTL Medium Voltage Network (JTM) operated by TM which includes all parts of the network and its equipment

Low Voltage Network (JTR) JTL operated by TR which covers all parts of the network and its equipment

High Voltage Network (JTT) JTL operated with TT covering all parts of the network and its equipment

Electricity Network (JTL) PLN's electricity distribution / distribution system that is operated by TR, TM, TT or TET

JBST Limited Sale and Purchase of Electricity

Kilo Meter Circuit (kms) A unit of length for a three-phase electric power transmission or distribution network

Kilo Volt Ampere (kVA) One thousand Volt Ampere, is a unit of power

Kilo Volt (kV) One thousand volts, is a unit of electric voltage

Kilo Watt (kW) Unit of actual (active) electric power

Kilo Watt Hour (kWh) Unit of real (active) electrical energy

kVA max-Meter Tool to measure the highest power consumption in units of kVA for a month divided by the kVA connected during one month, especially for customers B3, I4 and I3 arc furnaces, T

KVARh Kilo Volt Ampere Reactive Hour, unit of pseudo (reactive) electrical energy

kVARh Meter Measuring tool for pseudo (reactive) electrical energy consumption

kWh Meter Measuring tool for electrical energy consumption

kWh Double Rate Meter kWh Meter which has two registers, one register to measure energy consumption in WBP and the other register to measure energy in LWBP

kWh Meter Single Rate kWh Meter which has one register to measure energy consumption

LWBP Outside Peak Load Time (22.00 - 18.00)

M / TR, TM, TT Multipurpose Tariff intended for electricity users who require special services, both in Low Voltage, Medium Voltage and High Voltage

MVA Mega Volt Ampere (Million Volt Ampere)

Public Street Lighting Tax (PPJU) A tax paid by all PLN customers, collected by PLN and subsequently deposited in the local government treasury

Contact Board (PHB) Part of the customer's electrical installation that is used to distribute electricity

PB New Linking

PD Add Power / Change Power

Complete Termination Termination for continual distribution of electricity to the customer's installation by taking part or all of the equipment for the distribution of electricity to the customer's installation

Temporary Termination. Temporary termination of electricity supply to the customer's installation

Public Street Lighting (PJU) Lighting for roads and public infrastructure that is legally installed by the regional government or other official bodies and is legally supplied with electricity from PLN

Control of Electricity Usage (P2TL) Examination by PLN of PLN installations and customer installations in order to control the use / utilization of electricity

Potential Transformer (Voltage Transformer) A device to reduce the voltage required specifically for measuring electrical energy or other electrical safety and lowering equipment

The service entry line (SMP) cable owned by PLN that connects the Low Voltage network with the APP installed at the customer's house

Direct Connection Is a JTL or SL connection including the equipment so that electricity is transmitted without going through APP

Electrical Power Connection (STL) Conductors below or above the ground including their equipment as part of the PLN installation which is a connection

bro between PLN's JTL and the customer's installation

Electricity Bill Calculation of costs for the consumption of power and electrical energy by customers every month

Subsequent Claims Receivables later as a result of an adjustment to the provisions or as a result of a violation

Basic Electricity Tariff (TDL) Applicable government regulations regarding tariff groups and the selling price of electricity provided by PLN

Extra High Voltage (TET) System voltage above 245,000 Volts

Medium Voltage (TM) System voltages above 1,000 volts to 35,000 volts

Low Voltage (TR) System voltages up to 1,000 volts

High Voltage (TT) System voltage above 35,000 Volts to 245,000 Volts

Joint Connection Point The closest point to a customer where other customers are connected to JTR or JTM or JTr or JTET

Customer Security Deposit (UJL) Money which is a guarantee for power consumption and electrical energy while being a customer

Advance Electricity Bill (UMTL) Receipt of payment for power consumption and electrical energy preceding the power and energy transfer transaction

Volt Ampere (VA) Unit of power (blind power)

Volt (V) Unit of Electric Voltage

Peak Load Time (WBP) Time from 18.00 to 22.00 local time

Watt Real power unit

Hopefully Helpful, ... ^ _ ^

Komentar